(ĐN) – Chairman Dinh Quoc Thai of Dong Nai provincial People's Committee on March 4 presided over a meeting on the selection of design plan of An Hao bridge project.
(ĐN) – Chairman Dinh Quoc Thai of Dong Nai provincial People’s Committee on March 4 presided over a meeting on the selection of design plan of An Hao bridge project.
Under the plan, An Hao bridge will link Bien Hoa 1 Industrial Park in Bien Hoa city’s An Binh ward, which will be relocated to serve for the regional urban-residential development project, with Hiep Hoa isle, which will be turned into Hiep Hoa commune’s cultural and ecological center under the city’s approved plan.
The 492m long bridge will be built under the Built-Operation-Transfer (BOT) form with an estimated cost of more than VND700 billion.
The Corporation for the Development of Dong Nai Industrial Zone (Sonadezi) is entrusted to choose the design project for An Hao bridge.
Reported by H.G