Dong Nai needs US$14.3 mln for underground installation of power cable system

03:04, 16/04/2021

Dong Nai Power One-Member Limited Company will perform an underground installation project of power cable system along 14 streets and three newly-built streets in Bien Hoa City, Dong Nai Province for 2021-2030 period.

 

Dong Nai Power One-Member Limited Company will perform an underground installation project of power cable system along 14 streets and three newly-built streets in Bien Hoa City, Dong Nai Province for 2021-2030 period.

The company is implementing underground installation of medium and low voltage power distribution systems at the existing roads in Bien Hoa City.

Accordingly, the project needs VND330 billion (US$14.3 million) investment capital. However, the company has faced difficulty in capital attraction for the implementation. As this reason, the Dong Nai Power One-Member Limited Company proposed the People’s Committee of Dong Nai Province for budget allocation or preferential loans for the project as planned.

(Source:SGGP)