(ĐN)- Xuan Loc Office of Economics and Infrastructure has so far this year conducted maintenance for 15 km of roads in the district with a total cost of VND7.2 billion.
(ĐN)- Xuan Loc Office of Economics and Infrastructure has so far this year conducted maintenance for 15 km of roads in the district with a total cost of VND7.2 billion.
Accordingly, works were carried out on Xuan Dinh-Song Ray road repair, temporary bridge expansion on Tan Hiep road, painting rumble strips on Hung Vuong road, replacing traffic signs, lighting system, etc.
Reported by T.L