52km oil pipleline to run through Nhon Trach port cluster

03:07, 13/07/2015

(ĐN)- The Ministry of Industry and Trade has approved the master plan for development of Vietnam oil pipeline system until 2020 with a vision toward 2030.

 

(ĐN)- The Ministry of Industry and Trade has approved the master plan for development of Vietnam oil pipeline system until 2020 with a vision toward 2030.

Accordingly, the project of building oil pipeline connecting the Long Son oil refinery in Ba Ria-Vung Tau province and the Nha Be petrol and oil general depot in HCM city, which has total length of 52km, will run through Nhon Trach gas and oil port cluster.

Particularly, the oil pipeline starting form Long Son oil refinery will cross Thi Vai river to Phu My port in Ba Ria-Vung Tau province’s Tan Thanh district with the length of 17km, follow Dong Nai river to Nhon Trach district’s Phu Dong commune with the length of 35km, connect petrol and oil depot cluster in Nhon Trach district’s Phuoc Khanh commune and cross Nha Be river to end at the area of Nha Be petrol and oil general depot.

Reported by Q.K