According to a report from the Department of Agriculture and Environment, the province currently has 43 operational industrial parks (IPs), of which 41 have been equipped with centralized wastewater treatment stations meeting environmental standards.
In the former Dong Nai province, 31 IPs are operating centralized wastewater treatment stations, with a total designed capacity of nearly 235,000 cubic meters per day and night. Among them, 29 IPs with stable wastewater flows are fitted with automatic monitoring systems.
Meanwhile, in the former Bing Phuoc province, 10 IPs are operating centralized wastewater treatment stations that meet environmental standards, with a combined designed capacity of over 62,000 cubic meters per day and night. 9 of these IPs have installed automatic wastewater monitoring systems.
By: Ban Mai
Translated by: Quynh Giao - Thu Ha





Thông tin bạn đọc
Đóng Lưu thông tin